Wednesday, January 19, 2011
GREEN LAB
The PV panels are mounted as well as the horizontal axis turbine. As soon as we get the batteries connected we'll be able to direct some green power to them. The controllers and inverter are connected and even the "green" plug points in the lab below are ready for use. The small vertical axis savonius turbine is our green streetlight design. This switches on after dark and illuminates the area at night. Probably within a week the system will be up and running. The final phase will be the web portal to show actual energy harvested in real time.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment